February is gone
A lot of wiring done.
A lot of track laid. I ran trains on some of the track, I’ll try to post a video if I can figure it out or maybe a link to YouTube. The pink foam is the outline for the tunnels portals and the outline of the base for the mining site which sits on top. On the left is the turntable and roundhouse.
Next month tunnel portals and tops on the right side.