Northern Pacific N Scale Model Railroad

N Scale Model Railroading

Skip to content
Menu
  • Home
  • About the Model Railroad
  • Design Details and Parts
  • Project
  • The Arduino Project
  • The hole

A place to put all those wires and the DCC switch modules

by Kim GeddesPosted onApril 9, 2018April 11, 2018

So all those wires need a place to hide! From this   To this         Which then leads to this and this and finally this all nicely placed under a cover.

Read More

Did I say 6, I must have meant 7

by Kim GeddesPosted onApril 7, 2018

Forgot about the programing track. With DCC you need a separate track to program locomotives.  There it is.

Read More

A new data connection for the ESU DCC Command Station

by Kim GeddesPosted onApril 7, 2018

So the path required that the wall plate has to be recessed to clear the book cases, that fit under the mounting brace. From here,         Through the wall to here   then to here. That yellow…

Read More

How I keep the train set Vertical

by Kim GeddesPosted onApril 6, 2018

The bracket on the wall near the ceiling on the right, slides up and down, hooks the corner of the base.  I had to modify it after I installed the foam base.  Opps!  I needed to make it 1″ wider,…

Read More

Time to paint

by Kim GeddesPosted onApril 6, 2018April 6, 2018

A new coat of paint. Putting everything back Good for another 15 years.

Read More

March Madness

by Kim GeddesPosted onApril 6, 2018April 9, 2018

So this is a post to tell you about all the posts that are coming soon! The train room is currently laid out like a question mark.  Everything on the back wall:  book cases, drawers, and the train set itself…

Read More

February is gone

by Kim GeddesPosted onMarch 4, 2018March 17, 2018

A lot of wiring done. A lot of track laid. I ran trains on some of the track, I’ll try to post a video if I can figure it out or maybe a link to YouTube. The pink foam is…

Read More

From virtual track to real road bed and track

by Kim GeddesPosted onJanuary 31, 2018

Milestone 1

Read More

So another month passes

by Kim GeddesPosted onJanuary 31, 2018

The winter monsoon has meant more time has been spent this month on the build than would be expected.  I started on the left side ass it is the most complicated section. They say no battle plan lasts past the…

Read More

The Roundhouse and turntable laid out

by Kim GeddesPosted onJanuary 31, 2018
Read More

Posts navigation

Previous Page Page 1 … Page 6 Page 7 Page 8 Next Page

Find Us

Address
deep in the rain forest
B.C., Canada

Hours
Monday—Friday: 9:00AM–5:00PM
Saturday & Sunday: 11:00AM–3:00PM

Search

About This Site

Having fun making trains go around in circles!  A progress report on my build.

© Copyright 2023 – Northern Pacific N Scale Model Railroad
Canyon Theme by DesignCanyon ⋅ Powered by WordPress